{"currency":"USD","hours_per_month":730,"gpu":{"b300":{"label":"NVIDIA B300 SXM6","on_demand":10.0,"monthly":7.0,"annual":6.0,"unit":"GPU-hr","early_contract":12.0,"early_contract_note":"Committed-term reservation on new capacity; blocks of 8 GPUs; rate locked; priority energization"}},"inference":{"glm_5_2":{"label":"GLM-5.2","input_per_mtok":1.0,"output_per_mtok":4.0}},"updated_at":"2026-08-23T04:26:39Z","fx":{"base":"USD","rates":{"USD":1.0,"CAD":1.4334,"EUR":0.9113,"GBP":0.7636,"AUD":1.507,"JPY":158.7475,"INR":92.8891,"CNY":6.6933,"SGD":1.2896,"AED":3.6725,"CHF":0.8403,"SEK":10.2195,"NOK":9.7683,"BRL":5.9379,"MXN":19.124,"ZAR":17.5298,"SAR":3.75,"HKD":7.8387,"KRW":1343.3306,"NZD":1.8249,"PLN":4.0596,"TRY":50.602,"ILS":3.3463,"NGN":1376.7368},"ts":1795374586.0738971},"capacity":{"dc_100mw":{"label":"Data centre capacity - 100 MW program","per_kw_month":200.0,"currency":"USD","unit":"kW-month","note":"Early contract, provisioned power, phased blocks; retail colocation CA$225/kW/month","url":"https://spuric.com/en/capacity.html"}}}